Общайтесь с поставщика? поставщик
Kevin Mei Mr. Kevin Mei
Что я могу сделать для вас?
Чат Сейчас поставщик контакта

Unisite Group Ltd.

Перечень Продуктов

Главная > Перечень Продуктов > Структурные Трубы > Прямая труба > Welded straight pipes exhaust

PRODUCT CATEGORIES

Welded straight pipes exhaust
Welded straight pipes exhaust
Welded straight pipes exhaust
Welded straight pipes exhaust
Welded straight pipes exhaust

Welded straight pipes exhaust

Вид оплаты: L/C,T/T
Incoterm: FOB,CFR,CIF
Количество минимального заказа: 1 Piece/Pieces
Срок поставки: 30 дней

Базовая информация

    Модель: USA-297

    Dimension: As Per Drawing/order

    Alloy Or Not: Non-alloy

    Thickness: 0.5 - 30 Mm, 0.7mm To 10mm

    Standard: API, ASTM, BS, DIN, GB, API 5CT, API 5L, ASTM A335

    Application: Structure Pipe, Ship Building

    Section Shape: Round

    Outer Diameter: 10 - 1500 Mm

    Grade: 10#-45#, A53-A369, API J55-API P110, Q195-Q345, ST

    Secondary Or Not: Non-secondary

    Straight Pipe Exhaust: Welded Straight Pipes Exhaust

Additional Info

    Подробности Упаковки: bulk package and bulk vessel transportation container package and container transportation

    марка: UniSite

    транспорт: Ocean,Land

    Место происхождения: china mainland(zhejiang)

    Сертификаты : ISO/BV/CCS

Описание продукта

Ship building straight pipe is used to connect pipes in the ship a variety of mechanical equipment, used to convey information about the working medium water, oil, gas and so on. Ship line has two categories: power lines and ship system piping. Power line is used for the main and auxiliary services of various piping for fuel, oil, cooling water, compressed air, exhaust gas, waste heat and other pipeline. Ship piping systems is to improve the anti-sinking, the ship's stability, in order to meet the crew, passengers need a normal life. Welded Straight Pipes Exhaust


Technology research and development

We continuously develop the whole production equipments including pipeline production equipments, machining equipments, material inspection equipments, welding equipments, bending press equipments, rolling equipments, cutting equipments which can be played maximum role in each project and service.


Our products all over the world:

1. 2005 Palm island construction in Dubai: the large quantities of dredging pipeline including sink pipes, shore pipes with flanges and pontoons
2. 2005 Waterways dredging projects : the large quantities of pipeline, connected pontoons.
3. 2006 Waterways dredging projects: the large quantities of pipeline, connected pontoons.
4. 2007 Waterways dredging projects: the large quantities of pipeline, including sink pipes, shore pipes with flanges and pontoons.
5. 2008 Waterways dredging projects: the large quantities of pipeline, connected pontoons, floating pipelines and bends.
6. 2008 Capital dredging for a third berth at Anderson point in port Hedland in Australian: the large quantities of lsaw pipes
7. 2009 Waterways dredging projects: the large quantities of pipeline, connected pontoons and bends.
8. 2010 Environmental works:pontoon for work platform and pipes
......
and till now, above just a little projects we involved in.

UniSite`s core activity: serve for dredging and marine projects .Provide service and relevant parts for dredgers, including dredger construction, repairing and maintenance.Provide items for dredging, land reclamation, offshore, marine engineering, piling works, municipal engineering, mechanical engineering, oilfield projects and environmental remediation projects.

location of head office and two plants


Photos of our Floating steel dredging pipelines

Adjusting Straight Exhaust Pipes for sale Adjusting Straight Exhaust Pipes Straight Pipe Exhaust Welded Straight Pipes Exhaust





Technology

Offering our client best possible and most sustainable solutions to their requirement. Production procedure:
Step1: Drawing and technical requirement analysis, production lofting; 
Step2: Material cutting, trimming, groove, cleaning, bending, rolling, dimension & NDT inspection; 
Step3: From part assemble to whole assemble with accurate template and platform, dimension & NDT inspection, welding,           dimension & NDT inspection;
Step4: Other procedure if necessary;
Step5: Final dimension & NDT inspection for structure;
Step6: Machining if necessary;
Step7: Blasting and Painting with paint Hempel, Jotun, Inter, Sigma;
Step8: Package, Loading and Lashing when delivery;


Born from military factory, with rigorous team having rich experience of military marine products
We UniSite started as a small contractor of ship building works in military factory in Ningbo 10 years ago. After several years of accumulation, the team had owned a certain number of experienced managers, engineers, technicians and workers who have rich experience in military shipping building and have good marine practice.


Involved in many big projects all over the world
We have involved in many projects all over the world that we have ability to participate in big projects.


BV/CCS approval for manufacturer capability qualification

We passed the BV/CCS approval for manufacturer capability qualification for dredging & dredger products.


Our service
Besides above the general specifications, we can also supply some specific floating pipes and other similar steel structure as clients' requirements.

Package and shipping
bulk package and bulk vessel transportation
container package and container transportation


STRAIGHT PIPE




How to contact us?

Send your Inquiry Details in the Below, Click "Send" Now!

Группа Продуктов : Структурные Трубы > Прямая труба

Отправить Запрос

Kevin Mei

Mr. Kevin Mei

Электронная Почта:

kevin.mei@unisite.com.cn

Отправить Запрос

Номер Телефона :86-574-87053650

Fax:86-574-87889071

Мобильный Телефон:+8618957885266

Электронная Почта:kevin.mei@unisite.com.cn

Адрес Компании :11/F,BLOCK C15,LANE 299,GUANGHUA ROAD,HI-TECH PARK, Ningbo, Zhejiang,China, Ningbo, Zhejiang